Tenant improvement of a large retail store, cost effective, and innovative improvement to existing systems.

Creative duct design to minimize the cost of equipment change out.

Best possible use of ceiling space to accommodate maximum possible height of space.

Quality jobs require quality, custom made and standard ducts and dampers.

Large main ducts carry 65,000 CFM of air to be distributed in the building.

Clean Rooms Services

Product assembly class 1000 clean room.

Products are cured in highly controlled environmental chambers; temperature, humidity and cleanliness are of outmost importance.

Double wall, custom-made ducts are wiped by special degreasing chemicals before assembly.

Air is distributed to over 100 HEPA filters servicing the GaAsF class 100 clean room.

Refrigeration lines and hot water lines piped to custom made air-handling unit serving the assembly room.


Industrial

55-ton carrier Air Conditioning unit is lowered on top of a roof curb.

400-Ton trane Air cooled chiller is piped by under ground pipes.

Helicopter is used to lift large air conditioning units to out of crane reach roof top location.

50 HP pumps are piped to distribute chilled water to 6 air handling units.

64,000 CFM “HUNTER” air handler discharges air through 13x4 supply and return double wall ducts.